Baptist Health Hardin Emergency Room Expansion
10,000sf Phase 1 addition to the existing hospital building
Designed for 3 additional stories
Rock bearing caisson foundation system
Steel superstructure with moment frame lateral force resistance system for resisting wind and earthquake forces
Steel bolted “Side Plate” moment connections:
2nd project in KY to use these bolted versions of “Side Plate” system
Decreased erection time by weeks—no field welding
Reduced building sway
Eliminates erection bracing
20ft cantilevered ambulance canopy system
New main entry structure